The Formula 1 scheme provided a new build block of student accommodation in Newcastle. We were contracted to provide the SFS, CP boarding, Insulation, Drylining and Ceilings throughout the project. The project had prefabricated bathroom pods which we had to slide in place and install the drylining and ceiling in the rest of the flat. To get the pods into the flats, we partially built the walls, slid the pods in to place and then completed the wall.

SPECIFIC PROJECT DETAILS

  • Project Value: £640,000
  • Project Duration: 36 weeks
  • January 2017 – June 2017
  • Project Size: 2470m2 in SFS
  • Project Size: 8150m2 in Drylining

SERVICES PROVIDED

Our first project with Torsion was a success, we delivered a great student accommodation project for them.

Phil Bartley – Business Director of Kingston North East

structural-frame
dry-lining
Lay in grid

WHAT WE’VE BEEN UP TO

Keep up to date with the latest Kingston news to find out how we have helped leading contractors to find better and smarter ways of doing things to bring that little bit extra to every contract.

HAVE A PROJECT IN MIND?

Our experienced teams have built a strong reputation for providing quality service and finish, leading to many satisfied clients and high levels of repeat business.

    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    Not readable? Change text. captcha txt
    Harbert House SFS