Magna Park Unit 2, Corby For Volker Fitzpatrick

Magna Park
Magna Park
Magna Park Corby unit 2

DETAILS

We recently completed Magna Park Unit 2, a warehouse and office space in Corby. Our works ran from May to October 2023. Kingston have been working alongside Volker Fitzpatrick to fulfil the contracted work.

Kingston have worked closely with their client through careful planning and collaboration to deliver a successful project. We provided a complete drylining package, which covered the transport hubs, which covered 1360m² and main office accommodation of 2,805m2. On-site works involved partitions, column and beam encasements, lay in grid ceilings, MF ceilings, skim finish and soffit insulation.

One of the challenges faced during installation was fitting a 6-meter stud around mechanical and electrical components to support the shaft wall ceiling and suspended ceiling below. Another issue was fire protection. The Beam and column encasements were added to the package due to the omission of intumescent paint. Kingston worked with British Gypsum who provided project specific details, ensuring fire ratings were achieved. The solution was a triple layer of 15mm FireLine board fixed to the beams using a Gypliner encase system for the beams, whilst the Columns were mainly designed to use the Firecase frameless system. These difficulties resulted in having 30 operatives working on-site to ensure everything was on programme.

As part of our contracted works, we had to install the Promat Vermiculux board, a material we have not used before. This board was installed on all PFC channels around the window openings to ensure the correct level of fire protection was achieved. We liaised with Etex to ensure we followed the right guidelines and what we were installing was safe and fit for purpose.

Lastly, we are thrilled with the outcome of Magna Park, we worked collaboratively with Volker Fitzpatrick throughout to deliver a successful scheme. We look forward to working with them again in the future.

SPECIFIC PROJECT DETAILS

  • Project Value: £1 million
  • Project Date: May to October 2023
  • Project Size: 4,165m2
  • Project duration: 21 weeks

SERVICES PROVIDED

MPC2 Corby was a remarkable project to be part of. It was certainly one not without it’s challenges. Despite huge pressures with the addition of beam and column encasements and no additional time, the quality of the works completed was second to none.

Our team have been exceptional, with everyone sharing their years knowledge and experience to overcome every challenge they faced, we managed to overcome them and deliver an impressive package.

Everyone involved should be extremely proud of what we have delivered and I look forward to working with Volker Fitzpatrick in the future.

Chloe Payne – Managing Director of Kingston

dry-lining
Lay in grid
plastering
lay in grid ceilings
The Beam and column encasements
mechanical and electrical components

WHAT WE’VE BEEN UP TO

Keep up to date with the latest Kingston news to find out how we have helped leading contractors to find better and smarter ways of doing things to bring that little bit extra to every contract.

HAVE A PROJECT IN MIND?

Our experienced teams have built a strong reputation for providing quality service and finish, leading to many satisfied clients and high levels of repeat business.

    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    Not readable? Change text. captcha txt